Imperial 33648-115 Icvg Fan 115V W/16 Long Lead Wires

Imperial 33648-115 Icvg Fan 115V W/16 Long Lead Wires

In-Stock

$64.89
Manufacturer: Imperial
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options

Manufacturer part number: 33648-115

Imperial Icvg Fan 115V W/16 Long Lead Wires Part# 33648-115

Fan, Axial, 115V, 50/60HZ, 16 Wire Lead, ICVG

Weight: 2 lbs. Dimensions: Not Available

Compatible Models: Not Available